Manchester Grammar School (MGS) Resurfacing Work

Posted September 4th 2026

We recently completed a project at Manchester Grammar School.

The works included:

  • Existing carriageway planed out to approximately 100mm
  • Ironwork reset to suit the new finished levels
  • Existing sub-base regraded and compacted
  • 60mm binder course machine laid
  • 40mm 10mm surface course machine laid and compacted

A full-depth resurfacing job completed from preparation through to the finished surface — another stunning, durable finish from the Cheshire Surfacing team, built to last for years to come.

For all your Driveways, Private Roads and Surfacing requirements, simply get in touch for a free quotation.




← Back to blog