Single-track Lane in Marton, Winsford

Posted February 3rd 2023

This single-track lane was constructed with 150 tons of 14mm surface course. When busy single-access roads need to be resurfaced, timing is critical to minimise disruption for local residents. This project was planned out well in advance to allow our team to successfully completed this job within the day.

Check out our gallery below to see the result.